Beijing Qijia United New Material Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. chen lixin
  • Company Name : Beijing Qijia United New Material Co., Ltd.
  • Tel : 86-010-13311225806
  • Fax : 86-010-13311225806
  • Address : Beijing,Beijing,Wuxing Road Num 5, Lucheng town,Tongzhou District, Beijing City
  • Country/Region : China
  • Zip : 101100

prefabricated apartment

prefabricated apartment
Product Detailed
Related Categories:Office Buildings
1. installation speed is fast 2. the cost is economical 3. long life time 4. high wind resistant and anti-seismic performance

 

JH large-scale building system:

1. JH large-scale building system is a newly developed system by our company. It has many advantages such as short installation time, light weight, lower cost for foundation, better wind resistance and anti-seismic performance etc.

2. Let’s make a comparison between JH large-scale building system and traditional building system by taking one 12 floors of building with 6000m2 for example:

1) For traditional building, the total installation period is about 250 days, but for JH large-scale building system, the installation period is about 60 days.

2) For tradtional building, the total weight is about 6860 tons, but for JH large-scale building system the total weight is about 3600 tons.

3), For traditional building, the foundation cost is about uSD500000, but for JH large-scale building system the foundation cost is only half of that, that is about USD250000.

4). For traditional building, the total installation cost is about USD3600000, but for JH large-scale buildng system the total installation cost is only about USD3000000.

3. As JH large-scale building uses light weight materials to prefabricate modular wall and roof in the factory, so its wind-resistance and anti-seismic performance is better than traditional building.

4.The life time of JH large-scale building can be adjusted according to the building's usage and its significance. The highest life time is above 100 years.

5. JH large-scale building system can not only shorten the time for capital turnover by 76%, but also save 15% cost for the project, so it can create tremendous benefit for cuostmers in time and economic.

prefabricated apartment



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.